Roquette Project - Corby 
New SACC Tank Farm 'Handed Over'
Project involved:
Process design (pipe services)
Construction drawings (layouts and isometrics)
Functional design and hazop study
Installation of mechanical and process pipework
Demolition
Installation of vessels and equipment
Outages
Ensuring client remains in full production
Health and Safety
Commissioning
Scope of Responsibility:
Mechanical design - 33,000 metres of pipework - services (steam, water, compressed air), chemicals and process
6 distinct work areas
Process design - clarification of design
Installation of plant items - vessels, equipment etc.
Installation and testing of the 33,000 meters of pipework
Work Areas
Area 1 - New SACC Tank Farm
Area 2 - New Bulk Chemical Tank Farm
Area 3 - Glucose Production Facility
Area 4 - Filtration
Area 5 - Final Product / Outload
Area 6 - Interconnecting Pipework
T Musk Engineering Ltd Role
Partnering with our client to assist in design and development of the new glucose expansion project. Together with CDM control and co-ordination of other sub-contracting companies through to final commissioning.
|
|